Optimization of integrated production model calculations
https://doi.org/10.7868/S2587739920020093
Abstract
The article discusses a new technique for optimizing the calculations of the integrated model, all stages of the calculations are analyzed. The analysis of the necessary input data for the integrated model is carried out and the definition of the calculation results according to the obtained method is given. Comparison of calculations using the developed method and a commercial package is obtained. Opportunities for applying the obtained solution are proposed.
About the Authors
I. S. SenkinRussian Federation
Saint-Petersburg
L. I. Akmadieva
Russian Federation
Saint-Petersburg
E. V. Belonogov
Russian Federation
Saint-Petersburg
References
1. Lake L.W. Petroleum engineering handbook: Production operations engineering. – Society of Petroleum Engineers, 2007.
2. Beggs H.D., Brill J.P. Two-phase flow in pipes. – University of Tulsa, Oklahoma, 1978.
3. Beggs H.D. Production optimization using nodal analysis. – 1991.
4. Яубатыров Р.Р. и др. Технология оптимизации фонда скважин системы поддержания пластового давления на основе гибридного моделирования // PROНЕФТЬ. Профессионально о нефти. – 2019. – № 2. – С. 30–36.
5. Чамеев И.Л., Апасов Р.Т., Варавва А.И. и др. Интегрированное моделирование – инструмент повышения качества проектных решений при разработке нефтяных оторочек многопластовых НГКМ // Нефтяное хозяйство. – 2018. – № 12. – С. 46–49.
Review
For citations:
Senkin I.S., Akmadieva L.I., Belonogov E.V. Optimization of integrated production model calculations. PROneft. Professionally about Oil. 2020;(2):67-72. (In Russ.) https://doi.org/10.7868/S2587739920020093