Проактивный блочно-факторный анализ разработки месторождений
Об авторах
А. Н. СитниковРоссия
А. А. Пустовских
Россия
А. С. Маргарит
Россия
А. В. Ахметов
Россия
Д. Ю. Колупаев
Россия
Д. А. Ищук
Россия
М. А. Шакиров
Россия
Список литературы
1. Ojo K.P., Tiab D., Osisanya S.O. Dynamic Material Balance Equation and Solution Technique Using Production and PVT Data//Petroleum Society of Canada. – 2006. – March 1. – DOI:10.2118/06-03-03.
2. Rezapour A., Ortega A., Ershaghi I. Reservoir Waterflooding System Identification and Model Validation with Injection/Production Rate Fluctuations// Society of Petroleum Engineers. – 2015. – April 27. – DOI:10.2118/174052-MS.
3. Ling K., He J. Theoretical Bases of Arps Empirical Decline Curves//Society of Petroleum Engineers. – 2012. – January 1. – DOI:10.2118/161767-MS.
4. Decline Curve Analysis Using Type Curves— Analysis of Oil Well Production Data Using Material Balance Time: Application to Field Cases/ L.E. Doublet, P.K. Pande, T.J. McCollum, T.A. Blasingame//Society of Petroleum Engineers. – 1994. – January 1. – DOI:10.2118/28688-MS.
5. Izgec O., Sayarpour M., Shook G.M. Optimizing Volumetric Sweep Efficiency in Waterfloods by Integrating Streamlines, Design of Experiments, and Hydrocarbon Curves//Society of Petroleum Engineers. – 2010. – January 1. – DOI:10.2118/132609-MS.
6. Grinestaff G.H. Waterflood Pattern Allocations: Quantifying the Injector to Producer Relationship with Streamline Simulation//Society of Petroleum Engineers. – 1999. – January 1. DOI:10.2118/54616-MS.
7. Thiele, M.R., Batycky R.P., Fenwick D.H. Streamline Simulation for Modern Reservoir-Engineering Workflows. Society of Petroleum Engineers. – 2010. – January 1. – DOI:10.2118/118608-JPT.
8. Cao F., Luo H., Lake L.W. Development of a Fully Coupled Two-phase Flow Based Capacitance Resistance Model (CRM)//Society of Petroleum Engineers. –2014. – April 12. DOI:10.2118/169485-MS.
9. Streamlines for the Target Injection Calculation in Complex Field Conditions/ A. Gladkov, D. Kondakov, R. Gareev [et al.]//Society of Petroleum Engineers. – 2013. – October 15. – DOI:10.2118/166874-MS.
10. A Multivariate Autoregressive Model for Characterizing Producer-producer Relationships in Waterfloods from Injection/Production Rate Fluctuations/ K.-H. Lee, A. Ortega, N. Jafroodi, I. Ershaghi//Society of Petroleum Engineers. – 2010. – January 1. – DOI:10.2118/132625-MS
11. El-Khatib N.A. Waterflooding Performance in Inclined Communicating Stratified Reservoirs//Society of Petroleum Engineers. – 2010. – January 1. – DOI:10.2118/126344-MS 12. Galeev D., Dadalko R., Potapov A. Criteria and Techniques of Waterflooding Adjustment for Brownfield (Russian)//Society of Petroleum Engineers. – 2014. – October 14. – DOI:10.2118/171150-RU
12. Cao F., Luo H., Lake L.W. Development of a Fully Coupled Two-phase Flow Based Capacitance Resistance Model (CRM)//Society of Petroleum Engineers. – 2014. – April 12. – DOI:10.2118/169485-MS
Рецензия
Для цитирования:
Ситников А.Н., Пустовских А.А., Маргарит А.С., Ахметов А.В., Колупаев Д.Ю., Ищук Д.А., Шакиров М.А. Проактивный блочно-факторный анализ разработки месторождений. PROНЕФТЬ. Профессионально о нефти. 2016;(1):60-67.
For citation:
Sitnikov A.N., Pustovskikh A.A., Margarit A.S., Akhmetov A.V., Kolupaev D.Y., Ishchuk D.A., Shakirov M.A. Proactive analysis in the field development monitoring. PROneft. Professionally about Oil. 2016;(1):60-67. (In Russ.)