Application of dynamic pressure management technologies for successful drilling of the «undrillable» well at Severo-Danilovskoe field
https://doi.org/10.51890/2587-7399-2024-9-1-117-126
Abstract
Background. Problems, described in this paper, related to narrow equivalent circulation density (ECD) window which associated with problems such as formation fluid influx, drilling fluid losses, hole stability issues and etc. Another problem could be related to undrillable well conditions. Conventional drilling through undrillable zone in most cases will lead to simultaneous well control and losses. To overcome such well conditions at Severo-Danilovskoe field operator performs several well control operations and cement bridge installations, but in 90% cases it’s unsuccessful.
The aim. To optimize the process of drilling in complex geological conditions at Severo-Danilovskoe field a dynamic pressure drilling technology was introduced. It included specialized equipment, software, and adaptive engineering approach for ECD optimization in narrow mud weight window environment as well as for drilling through undrillable zones.
Materials and methods. An adaptive approach for flexible transition for one DPM technique to another was developed for expected well complexity. For drilling in narrow mud weight window managed pressure drilling (MPD) technique was applied, and for drilling without window — pressurized mud cap drilling technique (PMCD). To overcome unexpected conditions that were met while drilling (abnormal drilling fluid foaming, wellbore ballooning) unconventional well testing performed in order to examine well behavior at different overbalance/ underbalanced conditions.
Results. Application of dynamic pressure control technology and the development of unconventional procedures made it possible to successfully drill a well with undrillable conditions. The implemented set of well tests using DPM equipment made it possible to design the optimal methodology for killing the well and carrying out tripping operations with the drilling BHA and casing string.
Conclusions. Successful experience of application of DPM technology, as well as methods and procedures developed within this project objectives, could be used to simplify the well construction in difficult environment. This approach could reduce the cost of wells with naturally fractured carbonate reservoirs where presented a high risk of conditions together with abnormal foaming of the drilling fluid and wellbore ballooning.
About the Authors
D. S. KrivolapovRussian Federation
Dmitry S. Krivolapov — MPD drilling engineering manager
https://www.researchgate.net/profile/Dmitry-Krivolapov-2
16A, 3, Leningradskoe highway, 125171, Moscow
T. B. Soroka
Russian Federation
Taras B. Soroka — Product & service delivery manager
16A, 3, Leningradskoe highway, 125171, Moscow
A. М. Polyarush
Russian Federation
Artem М. Polyarush — Director
16A, 3, Leningradskoe highway, 125171, Moscow
V. Y. Nikitenko
Russian Federation
Viktor Y. Nikitenko — Deputy general director of drilling
3, Bolshoy Liteinyi avenue, 664007, Irkutsk
A. V. Averkin
Russian Federation
Aleksey V. Averkin — Manager of drilling engineering department
3, Bolshoy Liteinyi avenue, 664007, Irkutsk
V. N. Visloguzov
Russian Federation
Vyacheslav N. Visloguzov — Deputy general director of drilling
54/4, Academicheskaya str., 664056, Irkutsk
References
1. Krivolapov D., Soroka T., Dobrokhleb P., Krepostnov D, Ganiev D. A New Era in Multilateral Drilling in High Fractured Abnormal Reservoirs — Multiphase MPD // SPE Russian Petroleum Technology Conference, 2018. https://doi.org/10.2118/191512-MS
2. Krivolapov D., Soroka T., Polyarush A., Balalaev V. Successful application of Managed Pressure Drilling and Cementing on exploration well at Prohorovskoe Oil Field // SPE Russian Petroleum Technology Conference, 2021. https://doi.org/10.2118/206449-MS
3. Krivolapov D., Masalida I., Polyarush A., Visloguzov V. 2021. Successful implementation of PMCD technology for drilling and completing the well in undrillable conditions at S-D oilfield. Russian Petroleum Technology Conference, 2021. https://doi.org/10.2118/206456-MS
Review
For citations:
Krivolapov D.S., Soroka T.B., Polyarush A.М., Nikitenko V.Y., Averkin A.V., Visloguzov V.N. Application of dynamic pressure management technologies for successful drilling of the «undrillable» well at Severo-Danilovskoe field. PROneft. Professionally about Oil. 2024;9(1):117-126. (In Russ.) https://doi.org/10.51890/2587-7399-2024-9-1-117-126