Preview

PROneft. Professionally about Oil

Advanced search

New way to estimate of Achimov formation resource potential at a low level of study

https://doi.org/10.51890/2587-7399-2024-9-2-27-33

Abstract

Background. The Neocomian clinoform deposits of West-Siberian oil and gas province (WS), which state of exploration is uneven, is one of the fulfilment sources of Russian Federation’s hydrocarbon resource base. The most explored areas are in the south and middle parts of WS with the mature history of oil production and related to large regional uplifts. Though, zones of megadepressions and monoclines are poorly explored, mostly prospected with only few wells and   relatively rare seismic grid. These zones can potentially have rich resource base related to lithological objects and reservoirs of Achimov sequence represented by deepwater alluvial cone deposits.

These are geological reasons of poor exploration maturity of Achimov sequence: complexity of internal structure, poor reservoir parameters (porosity and permeability), high spatial heterogeneity that causes heterogeneity of lenses saturation and difficulties in predicting of perspective reservoirs out of large structural uplifts.

All these factors require using a variety of modifications of the density method when evaluating resource potential of objects.

Aim. Evaluation of resource potential of Achimov sequence object and taking into consideration all geological uncertainties and risks when performing economic-geological evaluation.

Materials and methods. The team of Gazprom neft companу group has developed an approach to probabilistic estimation based on density method, which allows correctly consider all major geological uncertainties when resource base evaluating.

Results. Approach design by Gazprom neft companу group has been successfully tested on real case object without any well data, but with 3D seismic grid. Results of this test formed the basis for production profiles estimation, forming program of geologic exploration activities and economic efficiency assessment within economic-geological evaluation.

Conclusions. The  methodology makes it possible to assess the commerciality of zones with partial and complete lack of geological and geophysical data and to justify the expediency of further appraisal of these zones. 

About the Authors

A. D. Musikhin
Gazprom neft companу group
Russian Federation

Artem D. Musikhin — Сand. Sci. (Geol.-Min.), Project manager

3–5, Pochtamtskaya str., 190000, Saint Petersburg



D. I. Mingazova
Gazprom neft companу group
Russian Federation

Dilyara I. Mingazova — Lead geologist

Saint Petersburg



R. P. Baykov
Gazprom neft companу group
Russian Federation

Ruslan P. Baykov — Lead geologist

Saint Petersburg



E. M. Viktorova
Gazprom neft companу group
Russian Federation

Evgeniia M. Viktorova — Project manager

Saint Petersburg



P. Y. Kiselev
Gazprom neft companу group
Russian Federation

Pavel Y. Kiselev — Head of project evaluation programs

Saint Petersburg



K. S. Telnova
Gazprom neft companу group
Russian Federation

Kseniia S. Telnova— Lead geologist

Saint Petersburg



References

1. Zharkov A.M. Peculiarities of geological structure and forecast of hydrocarbon deposits distribution in Achimov formation of Western Siberia // VNIGRI, 2016, 12 p.

2. Prélat A., Covault J.A., Hodgson D.M., Fildani A., Flint S.S. Intrinsic controls on the range of volumes, morphologies, and dimensions of submarine lobes // Sedimentary Geology, 2010, no. 232, pp. 66−76.

3. Hramcova A.V., Pahomov S.I., Natchuk N.YU., Kalashnikova M.P., Romashkin S.V., Musihkin A.D., Semenova N.G (2020). Facies models of Achimov formation of East Urenoy licensing area as a basis for optimizing exploration and development systems // Georesursy, no. 22(3), pp. 68–76 (In Russ.).

4. Mezenceva A.V., Bajkov R.P., Zverev K.V., Solov’ev V.V., Butkeev A.S., Ulybina I.V. Typification of alluvial fans in Achimov deposits of Urenoy field // Neftegazovaya geologiya. Teoriya i praktika, 2019, vol.14, no. 3, pp. 1–11.

5. Mingazova D.I., Bajkov R.P., Viktorova E.M., Musikhin A.D., Kiselev P.YU. Approach to probabilistic assessment of resource base of non-structural objects under conditions of low exploration in the example of Achimov formation of Western Siberia // “Geomodel’ 2021”, Gelendzhik, Rossiya, 6–10 sentyabrya 2021.

6. Mingazova D.I., Musikhin A.D., Bajkov R.P., Viktorova E.M., Kolesnikov D.S., Tyshkevich A.A. Approaches to probabilistic assessment of resource potential of a subsoil plot in the northern part of Western Siberia under conditions of various degrees of exploration along the section // “Geomodel’ 2021”, Gelendzhik, Rossiya, 5–8 sentyabrya 2022.

7. ZHigulina D.I., Mingazova D.I., Grigor’ev D.S., Klimov V.YU., Latysheva M.V., Kiselev P.YU. Approach to assessment of resource potential and further development of non-structural traps under conditions of limited data on the example of Achimov formation of Western Siberia // PRONEFT. Professionally about oil , 2021, no. 6(3), pp. 52–60. https://doi.org/10.51890/25877399-2021-6-3-52-60E.

8. Mutti E. Turbidite sandstones // Instituto di Geologia Universita di Parma, 1992, 275 p.


Review

For citations:


Musikhin A.D., Mingazova D.I., Baykov R.P., Viktorova E.M., Kiselev P.Y., Telnova K.S. New way to estimate of Achimov formation resource potential at a low level of study. PROneft. Professionally about Oil. 2024;9(2):27-33. (In Russ.) https://doi.org/10.51890/2587-7399-2024-9-2-27-33

Views: 211


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2587-7399 (Print)
ISSN 2588-0055 (Online)