Preview

PROneft. Professionally about Oil

Advanced search

Determination of optimal oil reservoir for associated petroleum gas injection on the example of a field of the Gazprom neft company group

https://doi.org/10.51890/2587-7399-2024-9-3-129-134

Abstract

Aim. The development of oil zones of oil and gas fields located in remote, hard-to-reach areas with no infrastructure is complicated by the problem of utilization of associated petroleum gas (APG). This problem arises most acutely during the development of narrow oil rim in oil and gas condensate fields with a massive gas cap. In such a case, there is a possibility of an abrupt increase in the gas-oil ratio due to gas breakthroughs to oil wells from the gas cap. A possible way to solve the problem of rational use of APG in such conditions is to form a field development system using the technology of gas injection into temporary underground storage facilities. For this purpose, it is required to justify facilities used for the APG injection to temporary reservoirs, which is the main goal of the study.
Materials and methods. Analysis of geological and geophysical information of the oil field and study of world experience [3] of gas injection to underground reservoirs. Forming of requirements and parameters of a reservoir influencing efficiency of the process of gas injection.
Results. A methodology for a comprehensive assessment of the reservoir geological parameters for gas injection has been developed. It allows to characterize all reservoirs of the field in terms of the possibility of their use for gas injection and to identify the most acceptable.
Conclusion. As a result of the analysis, it was found that the most promising reservoir at this field for temporary storing of a gas are the layers NP2-3, NP4 and YU2-6.

About the Authors

A. V. Voivodianu
Gazprom neft companу group
Russian Federation

Artyom V. Voivodianu - Employee

3–5, Pochtamtskaya str., 190000, Saint Petersburg



V. V. Ilikbaev
Gazprom neft companу group
Russian Federation

Valery V. Ilikbaev - Employee

3–5, Pochtamtskaya str., 190000, Saint Petersburg



V. I. Virt
Gazprom neft companу group
Russian Federation

Vitaly I. Virt - Employee

3–5, Pochtamtskaya str., 190000, Saint Petersburg



A. S. Vinogradov
Gazprom neft companу group
Russian Federation

Anton S. Vinogradov - Employee

3–5, Pochtamtskaya str., 190000, Saint Petersburg



References

1. Fominykh O.V. Resource-saving technologies in oil industry / O.V. Fominykh, S.A. Leontiev, A.V. Ivanov, A.N. Marchenko. St. Petersburg, Nedra, 2011. 184 p.

2. Misnik V.N. Petroleum gas utilization technology by re-injection into a gas cap / V.N. Misnik, S.I. Grachev, A.N. Khalin // Oilfi eld business. 2016, no. 7, pp. 36–39.

3. Isaeva N.A. Development of technology and methods of regulating storage of petroleum gas in reservoir of temporary underground storages. Dissertation of the Candidate of Technical Sciences: 25.00.17. Moscow., 2011. 122 p.

4. Gimatudinov Sh.K., Shirkovsky A.I. Physics of oil and gas formation. Moscow: Nedra, 1982. 311 p.


Review

For citations:


Voivodianu A.V., Ilikbaev V.V., Virt V.I., Vinogradov A.S. Determination of optimal oil reservoir for associated petroleum gas injection on the example of a field of the Gazprom neft company group. PROneft. Professionally about Oil. 2024;9(3):129-134. (In Russ.) https://doi.org/10.51890/2587-7399-2024-9-3-129-134

Views: 130


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2587-7399 (Print)
ISSN 2588-0055 (Online)