Preview

PROneft. Professionally about Oil

Advanced search

Upgrading of existing lifting units and equipment for current and workover of wells

https://doi.org/10.51890/2587-7399-2022-7-1-134-139

Abstract

The main task of well servicing workover units to maintain all active wells fully operable while ensuring compliance with all applicable subsoil protection requirements. The technical equipment of well servicing workover units crews requires automation and robotization, in view of the constant increase in the complexity of well workovers, growing safety barriers and a high proportion of heavy manual labor. Target. In order to automate lifting units for underground workover of wells, a pilot-industrial test project (PIT) «Meh-Brigade» was launched. The purpose of the pilot study is to improve the design of lifting units and equipment, to select the optimal layout for the placement of personnel at the wellhead. Materials and methods. The project involves the improvement and automation of tripping operations by integrating the following main components: cab-transformer, elevator with hydraulic pipe gripper, robot key, mechanized receiving bridge, hydraulic blowout prevention equipment (BOP). Results. A market review was conducted among companies that produce lifting units in the Russian Federation, Europe, China, and the calculation of economic efficiency is being carried out. Conclusion. The pilot test is scheduled for mid-2023.

About the Authors

Sergey V. Zimenkov
Gazpromneft LLC STC
Russian Federation


Linar N. Sabitov
Gazpromneft-Khantos LLC
Russian Federation


Sergey N. Targoniy
Gazprom-Neft
Russian Federation


References

1. Игнатьев М. Хирурги нефтяных скважин [Электронный ресурс] // Нефтегазовая вертикаль. — 2003. — № 12. http://www.uran.donetsk.ua/~masters/2006/ggeo/korol/library/2.htm

2. Осиновская И.В. Реализация системного подхода в планировании капитального ремонта скважин // Теория и практика общественного развития. — 2015. — № 12. https://cyberleninka.ru/article/n/re-alizatsiya-sistemnogo-podhoda-v-planirovanii-kapitalnogo-remonta-skvazhin

3. Техника и технология добычи нефти: Учебник для вузов / А. Х. Мирзаджанзаде, И. М. Ахметов, А. М. Хасаев, В. И. Гусев. Под ред. проф. А. Х. Мирзаджанзаде. — М.: Недра, 1986. — 382 с.

4. Зименков С.В., Тишкевич С.В. Развитие рынка высокотехнологичных подъемных агрегатов в РФ // Нефть. Газ. Новации. — 2019. — №7. — С. 22–25.


Review

For citations:


Zimenkov S.V., Sabitov L.N., Targoniy S.N. Upgrading of existing lifting units and equipment for current and workover of wells. PROneft. Professionally about Oil. 2022;7(1):134-139. (In Russ.) https://doi.org/10.51890/2587-7399-2022-7-1-134-139

Views: 528


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2587-7399 (Print)
ISSN 2588-0055 (Online)