Application of superblocks for increasing efficiency of project implementation
https://doi.org/10.7868/S2587739920030052
Abstract
The works associated with the construction of infrastructure facilities in the field require significant involvement of highly qualified specialists, high-quality implementation of these works and it requires adjustment of the developed project documentation directly in the construction process. PJSC «Gazprom neft» is faced with the task of increasing the efficiency of capital projects, in particular, reducing the time for their implementation. The faster the field is equipped and ready to start production, the sooner the capital investment in the project will pay off. The article discusses the method of organizing the construction (arrangement) using block-complete devices, namely one of its methods – superblocks. The essence of the method is the manufacture in the factory of modules, enlarged mounting assemblies, instrumentation and automation devices and their subsequent enlarged assembly into a large-capacity unit (superblock). The mass of the superblock can reach up to 1000 tons. The use of superblocks in the development of oil and gas fields guarantees high productivity, time saving and the quality of the facilities being built.
About the Authors
A. V. TrifonovRussian Federation
Tyumen
M. S. Volodkin
Russian Federation
Tyumen
D. N. Poltavskiy
Russian Federation
Tyumen
References
1. Sokolov S.M., Strekopytov S.K., Tukaev Sh.G. The problems of large blocks construction of oil and gas facilities. Neftyanoe khozyaistvo [Oil Industry Journal]. 2008, no. 3, pp. 94–95. (In Russ.)
2. Karpov V.P. The North and the Arctic in the «General Perspective» of the USSR: problems of integrated development. Ural’skii istoricheskii vestnik [Ural Historical Journal]. 2016, vol. 50, no. 1, pp. 91–99. (In Russ.)
3. Aronov V.A. Block-complete technology and organization of construction of oil and gas facilities in Western Siberia: concept and production experience. Zhurnal neftegazovogo stroitel’stva [Journal of Oil and Gas Construction]. 2014, no. 3, pp. 61–70. (In Russ.)
4. Busygina A.N., Korkishko A.N. . Complete-block method for organizing the construction of oilfield facilities. Vestnik MGSU [Monthly Journal on Construction and Architecture]. 2017, vol. 12, iss. 4 (103), pp. 430–432. (In Russ.)
5. Ob utverzhdenii gosudarstvennoi programmy Rossiiskoi federatsii «Sotsial’no-ekonomicheskoe razvitie Arkticheskoi zony Rossiiskoi federatsii na period do 2020 goda»: Postanovlenie Pravitel’stva RF ot 21 aprelya 2014 goda no. 366 [Resolution of the Government of the Russian Federation of April 21, 2014 No. 366: On the approval of the state program of the Russian Federation «Socioeconomic development of the Arctic zone of the Russian Federation for the period up to 2020»]. (In Russ.)
Review
For citations:
Trifonov A.V., Volodkin M.S., Poltavskiy D.N. Application of superblocks for increasing efficiency of project implementation. PROneft. Professionally about Oil. 2020;(3):40-43. (In Russ.) https://doi.org/10.7868/S2587739920030052